[Other] [Other]Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects

UsmanAhmad0005 Post time 1 hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-06-09 04:17
Reward10points

https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917

Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects[size=0.75]Authors: Mohamad Abdul Nabi, S.M.ASCE [email protected], and Islam H. El-adaway, F.ASCE https://orcid.org/0000-0002-7306-6380 [email protected][size=0.625]Author Affiliations



I need this paper urgently


Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Junior Member
  • post

  • reply

  • points

    20


Daily Top Contributors

Return to the list