[Other] Predicting Construction Cost Index Using a VMD-GRU Framework with the MHSA Mechanism

BlackP_Panther Post time 1 hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-06-18 02:56
Reward20points

journalㄩJournal of Construction Engineering and Management

AuthorsㄩJun Wang; Ziyi Qu; Martin Skitmore

Published dateㄩ2026-1-

DOIㄩ10.1061/jcemd4.coeng-17141

PDF linkㄩhttps://ascelibrary.org/doi/pdf/10.1061/JCEMD4.COENG-17141

Article linkㄩhttps://doi.org/10.1061/jcemd4.coeng-17141

Article SourceㄩAmerican Society of Civil Engineers (ASCE)


Remarkㄩ
Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Junior Member
  • post

  • reply

  • points

    30


Daily Top Contributors

Return to the list