[Elsevier] Preventive maintenance optimization for key components of subway train bogie with consideration of failure risk

saad_1243 Post time Half hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-07-04 03:16
Reward40points

journalㄩEngineering Failure Analysis

AuthorsㄩHaimeng Sun; Deqiang He; Jiecheng Zhong; Zhenzhen Jin; Zexian Wei; Zhenpeng Lao; Sheng Shan

Published dateㄩ2023-12-

DOIㄩ10.1016/j.engfailanal.2023.107634

PDF linkㄩhttps://www.sciencedirect.com/sc ... 350630723005885/pdf

Article linkㄩhttps://doi.org/10.1016/j.engfailanal.2023.107634

Article SourceㄩElsevier BV


Remarkㄩ
Reply

Use magic Donate Report

All Reply1 Show all posts
dinogami Post time Half hour(s) ago | Show all posts

Waiting for confirmation

If the PDF has not been accepted after 72 hours, the system will automatically adopt it.
Reply

Use magic Donate Report

Return to the list