[Elsevier] A novel predictive-reactive rescheduling method for products assembly lines with optimal dynamic pegging

poisonivy Post time 1 hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-07-27 21:46
Reward10points

journalㄩComputers & Industrial Engineering

AuthorsㄩShokraneh K. Moghaddam; Kazuhiro Saitou

Published dateㄩ2022-9-

DOIㄩ10.1016/j.cie.2022.108496

PDF linkㄩhttps://www.sciencedirect.com/sc ... 360835222005150/pdf

Article linkㄩhttps://doi.org/10.1016/j.cie.2022.108496

Article SourceㄩElsevier BV


Remarkㄩ
Reply

Use magic Donate Report

All Reply1 Show all posts
fercuneo Post time 1 hour(s) ago | Show all posts

Waiting for confirmation

If the PDF has not been accepted after 72 hours, the system will automatically adopt it.
Reply

Use magic Donate Report

Junior Member
  • post

  • reply

  • points

    50


Return to the list