[ACS] [ASCE] Monitoring Railway Bridge KW51 Before, During, and After Retrofitting

hai83 Post time Yesterday 17:15 | Show all posts |Read mode
This post will be closed automatically in 2026-08-15 17:12
Reward10points

Monitoring Railway Bridge KW51 Before, During, and After Retrofitting[size=0.75]

[size=0.75]Authors: K. Maes https://orcid.org/0000-0003-4188-3180 [email protected] and G. Lombaert [email protected][size=0.625]Author Affiliations
[size=0.75]Publicatio[size=0.75]https://doi.org/10.1061/(ASCE)BE.1943-5592.0001668[size=0.75]n[size=0.75]:[size=0.75] [size=0.75]Journal of Bridge Engineering
Volume 26, Issue 3





https://doi.org/10.1061/(ASCE)BE.1943-5592.0001668



Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Junior Member
  • post

  • reply

  • points

    10


Return to the list