[Other] Multiobjective Construction Schedule Optimization with Labor Resource Allocation: Coupling Parameter-Adaptive Genetic Algorithm and Network Flow

LMM0603 Post time Half hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-09-25 20:30
Reward20points

journalㄩJournal of Construction Engineering and Management

AuthorsㄩYue Li, S.M.ASCE; Rui Gao; Haitao Wu; Jiangtao Wen; Tianxiang Li; Xiaoqin Dong

Published dateㄩ2026-5-1

DOIㄩ10.1061/jcemd4.coeng-17127

PDF linkㄩhttps://ascelibrary.org/doi/pdf/10.1061/JCEMD4.COENG-17127

Article linkㄩhttps://doi.org/10.1061/jcemd4.coeng-17127

Article SourceㄩAmerican Society of Civil Engineers (ASCE)


Remarkㄩ
Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Junior Member
  • post

  • reply

  • points

    50


Daily Top Contributors

Return to the list