[Other] roposing a Material-Driven Recovery Schedule Optimization Framework: Spool Fabrication Case

Peter92782 Post time 1 hour(s) ago | Show all posts |Read mode
This post will be closed automatically in 2026-11-05 01:46
Reward25points

  author: Liu, Jing and Lu, Ming  title: Proposing a Material-Driven Recovery Schedule Optimization Framework: Spool Fabrication Case  booktitle: Proceedings of the 16th International Conference on Computing in Civil and Building Engineering (ICCCBE 2016)  year: 2016  pages: 1083-1090  address: Osaka, Japan

Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Senior Member
  • post

  • reply

  • points

    855


Return to the list