[Other] [Other]A Seamless Execution of Managed Pressure Drilling Controlling Drilling Hazards and Pore Pressure Uncertainty Related High-Pressure High-Temperature in Horizontal North Kuwait Jurassic Deep Wells

AlbertoDiaz Post time Yesterday 10:39 | Show all posts |Read mode
This post will be closed automatically in 2026-11-06 10:59
Reward50points

Edited by AlbertoDiaz at 2026-11-3 11:01

Managed Pressure Drilling Technique Commingled High Pore Pressure Section with Depleted Section, Eliminate Drilling Hazard and Pore Pressure Uncertainty Related High-Pressure High-Temperature in West Kuwait Jurassic Deep Wells

B. S. Al Mokaimi, M. Alsarhan, A. Al Mutairi, H. Al-Habib, J. Anton, M. Al-Khaldy, B. Selami, H. Benyounces, R. M. Alqabandi, G. Marin
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the ADIPEC, November 4每7, 2024
Paper Number: SPE-222742-MS
[color=var(--WDS-content-external-link)]https://doi.org/10.2118/222742-MS
... Abstract The main goal was to successfully drill a re-entry well in the Rahiyah Field, West Kuwait, overcoming the challenge of commingle drilling from the Najmah to Middle Marrat formations characterized by High-pressure High-Temperature (HPHT) conditions and significant pressure uncertainty...

Reply

Use magic Donate Report

All Reply0 Show all posts

Reply

You have to log in before you can reply Login | Register

Points Rules

Junior Member
  • post

  • reply

  • points

    290


Return to the list